Overview:
Eggrock bathrooms help plumbing contractors save time and be more productive by eliminating delays caused by scheduling conflicts with other trades that often occur with site-built bathrooms. They can do more work with a smaller site crew, enabling smaller contractors to do larger jobs. Also, they can focus on plumbing instead of the tedious, time-consuming bathroom finishes.
Benefits:
- Simplifies the most frustrating part of the plumbing job the finishes.
- Eliminates costly delays due to other trades.
- Improves efficiency, enabling smaller crews to do larger jobs.
- Easy to hook up - in about two hours, for a team of two
|
Features of Note:
- All bathroom hot and cold supply lines are routed to one location for final hook-up.
- Aside from a vanity p-trap, all waste lines are installed on site and consist of connecting the pre-set fixtures to the plumbing risers.
- Eggrock provides drawings and templates to facilitate correct underslab pipe and coring locations.
- The plumber still includes the bathroom fixtures in the permit application.
- Eggrock is responsible for any plumbing problem within the bathroom and will typically contract with the site plumber in the unlikely event that repairs are needed on the Eggrock unit.
- All supply lines are tested to 100 psi.
- All Eggrock bathrooms meet local and national codes.
- All walls are left open so inspections can be done easily and without delay.
- Final placement and hook-up requires about four man-hrs.
|